The Step-by-Step Roof Replacement Process Explained for Houston Homeowners

May 09, 2025

Replacing your roof is a big decision—and for many Houston homeowners, an unfamiliar one. What happens after you sign the contract? How long will it take? Will your daily routine be affected?

This guide breaks down exactly what you can expect during the roof replacement process, so you feel informed and in control from start to finish.

1. Initial Roof Assessment and Quote

Everything starts with a free roof inspection. We assess your current roof’s condition, identify damage, and discuss your options. You’ll receive:

  • A full report with photos
  • Material recommendations (e.g., asphalt vs. metal)
  • A transparent quote with estimated timeline

This step also includes checking for potential insurance involvement if the roof is storm-damaged.

2. Permits and Preparation

Once you approve the quote, our team handles permits with your local Houston jurisdiction. We’ll:

  • Pull required building permits
  • Coordinate material delivery to your property
  • Confirm your preferred start date

You’ll be advised to:

  • Move vehicles away from the driveway
  • Secure outdoor furniture or decorations
  • Notify nearby neighbors if needed
roof replacement

3. Tear-Off: Removing the Old Roof

On the scheduled day, we begin by removing old shingles, underlayment, and damaged decking (if applicable). This process usually:

  • Starts early morning
  • Takes 1 day for most single-family homes
  • Includes debris collection and disposal

4. Structural Repairs and Prep Work

Before we lay new materials, we:

  • Inspect the roof deck
  • Replace rotten wood or soft spots
  • Install drip edges and leak barriers
  • Set up new underlayment and flashing systems

This step ensures your new roof rests on a strong foundation.

5. Roof Installation

We install your new roofing material with precision and care. This includes:

  • Starter shingles and ridge caps
  • Ventilation components
  • Chimney flashing, valleys, and detail work

Weather permitting, this process is completed the same day or by day two for larger homes.

6. Cleanup and Final Inspection

After installation, we:

  • Clean your gutters and yard
  • Magnet-sweep for nails and debris
  • Conduct a walkthrough with you
  • Provide a warranty and care instructions

This article is best linked from the pillar blog section titled “What Happens During a Professional Roof Inspection?” as a follow-up explainer.

Read more about roofing codes and inspection requirements from the Texas Department of Licensing and Regulation

Is Roof Replacement Disruptive?

It’s noisier than a repair, but you can stay in your home. We work fast and professionally, keeping your routine as undisturbed as possible.

Most jobs are done in 1–2 days.

Final Thoughts: Clear Expectations = Less Stress

Knowing what to expect makes the roof replacement process a lot less intimidating. At 12 Stones Roofing, we handle everything—from permits to clean-up—so you don’t have to lift a finger.

Have questions? Ready to get started?

Click here to schedule your free inspection and get your roof replacement timeline and quote today.